New Case Study: Electric Distribution System for Hannibal Board of Public Works

Mid-West GIS was contracted by the Hannibal Board of Public Works in 2012 to do a complete field inventory and update existing GIS data for their Electric Distribution System Utility Database. This included over 350 miles of line and 9,455 utility poles. The data had already been converted into a geodatabase, but needed field verified as well as additional data added that was missing.

View The Case Study Request An Estimate!